Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 84
URES
MANAGEMENT CONSIDERATIONS
a Soil
prepared
Where required, soils and erosion on site (including
disturbed areas) are to be managed in accordance
with Managing Urban Stormwater: Soils and
Construction (The Blue Book).
dures to
otentially
ot cause
t should
during
e topsoil
Appendix
included
gn and
MP to be
actor.
y is to be
ntractors
ng phase
ks.
propriate
storage,
ning and
rage and
d waste
ed.
RESPONSIBILITY
Contractor.
All excavated material shall be stockpiled to avoid
sediment entering the drainage system and other
waterways.
Any excess material shall be
appropriately disposed of, off-site. Any stockpiles
shall be covered/bunded with suitable sediment
control material.
During the final preparation of the final plans, a
detailed Site Investigation is to be undertaken.
Machinery and vehicles are to remain on existing
roads and access tracks wherever possible. All
vehicle movements off formed access tracks are to
be kept to a minimum.
An asbestos management plan with an unexpected
finds protocol should be prepared and implemented
during
construction
to
protect
intrusive
maintenance workers.
Plans to be reviewed to identify and include the
location of underground services.
Workers are to be carried outcome in accordance
with the CEMP and Landscape Plan.
Contractor.
Site Manager.
Page | 73