Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 83
POTENTIAL IMPACTS OR
ISSUES
ITEM
Soils and
Contamination
Soil erosion and sediment runoff
due to ground removal and
disturbances caused by excavation.
MITIGATION MEASU
As part of the CEMP,
Management Plan is to be p
and implemented.
CEMP to identify proced
ensure
any
po
contaminated soil does no
harm to the environment
this
be
uncovered
construction works.
Recommendations of the
and subsoil assessment (A
L – Addendum) are to be
within the final desig
incorporated into the CEM
prepared by the civil contra
Underground
infrastructure
structures
Visual
and
Minimum impacts are envisaged on
reticulated
water,
sewer,
stormwater,
electricity,
and
telecommunication infrastructure.
Dial Before You Dig enquiry
undertaken by Civil con
during the detailed plannin
and before excavation work
Minor visual impacts are identified
for the proposal during and post
construction
As part of the CEMP, app
measures for equipment
parking, stockpile screeni
arrangements for the stor
removal of rubbish and
materials are to be provide
17/0065 | Revised REF: Camden Valley Way Upgrade Works