Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 802
KERB
Consultant
GUTTER
ACOR Consultants Pty Ltd
Level 1, 54 Union Street
Cooks Hill, Newcastle NSW 2300
Client
Candem Council
70 Central Ave,Oran Park NSW 2570
COARSE MULCH, SANDSTONE OR
BLUESTONE/BASALTSCOUR PROTECTION /
ENERGY DISSIPATION APRON
2000
FOOTPATH
COARSE MULCH, SANDSTONE OR
BLUESTONE/BASALTSCOUR PROTECTION/ENERGY
DISSIPATION APRON
DOWNSTREAM KERB TO FINISH 50mm ABOVE ADJACENT
GUTTER
TREE IN CENTRE OF PIT
PLANTING HOLE
KERB
TEMPORARY TREE GUARD
200
KERB
R3
ROOT BARRIER TO EDGE OF TREE PIT
00
DIRECTION OF
WATER FLOW
360
ROAD
FILTER MEDIA
CONCRETE KERB TO FINISH FLUSH WITH
ADJACENT GUTTER
TRANSITION LAYER
2100
Group GSA Pty Ltd ABN 76 002 113 779
Level 7, 80 William St East Sydney NSW
Australia 2011
www.groupgsa.com
T +612 9361 4144
F +612 9332 3458
architecture interior design urban design landscape
nom architect Lisa-Maree Carrigan
Project Title
Camden Valley Way
upgrade between Hilder St
and Kirkham Lane including
Liz Kernohan Dr extension
DRAINAGE LAYER
SLOTTED PVC PIPE CONNECTED TO STORMWATER
SYSTEM
SUBGRADE
INDICATIVE LOCATION OF STORMWATER SERVICES
Drawing Title
DETAILS
-
Scale
1:- @A1
Drawing created (date)
04
7001
TREE PIT - PASSIVE IRRIGATION
1 : 20
NSW 7568
05
TYPICAL PLAN
7001
TREE PIT - PASSIVE IRRIGATION
1 : 20
TYPICAL SECTION
04/09/2023
By
FR
Plotted and checked by
FR
Verified
FR
Approved
FR
Project No
Drawing No
A220642 7001
Issue
B
File
Plot Date
$FILE$
$DATE$
This drawing is the copyright of Group GSA Pty Ltd and
may not be altered, reproduced or transmitted in any
form or by any means in part or in whole without the
written permission of Group GSA Pty Ltd.
All levels and dimensions are to be checked and verified
on site prior to the commencement of any work, making
of shop drawings or fabrication of components.
Do not scale drawings. Use figured Dimensions.