URES
MANAGEMENT CONSIDERATIONS
RESPONSIBILITY
nagement The contractor is to incorporate management Contractor.
water is procedures into the CEMP to ensure no impact to
relevant existing groundwater conditions.
Management
measures identified in the soils and contamination,
and hydrology and water quality items should be
sufficient in this instance.
w
the The contractor is to review the Heritage Impact Contractor.
Heritage Assessment report attached as part of this REF. CEMP
prepared is to identify and follow recommendations. In the
and event that a potential European heritage or Aboriginal
mise and cultural heritage item or artefact is identified during
items in construction works, work is to cease, and an
appropriately qualified heritage consultant and/or the
NSW Office of Environment and Heritage (OEH) is to
be contacted to advise the contractor of appropriate
management and mitigation measures.
dures to The contractor shall ensure the CEMP includes Contractor.
, oil) and measures to manage, erosion and sediment, and
aterways contaminants to ensure no impact on the retention
of a Soil basin. The CEMP should consider Managing Urban
an.
Stormwater: Soils and Construction (The Blue Book).
•
•
Any liquid split including oils, shall be
immediately contained, and cleaned up.
Exposed surfaces shall be kept to a minimum to
limit the potential for erosion.
Access to the site shall be restricted during and
following rainfall events to ensure disturbance is
limited.
an (LMP) Landscaping is to be implemented in accordance with Contractor.
ure cost- the approved plans.
onsistent
Page | 71