MANAGEMENT CONSIDERATIONS
RESPONSIBILITY
The contractor is to prepare a CEMP to address all Contractor.
issues and controls raised in this REF. The CEMP are
to be prepared by the civil contractor prior to any
construction activity on site with due consideration to
the recommendations in this report.
during The CEMP is to identify appropriate management Contractor.
propriate procedures for dust suppression.
g extreme Workers should be made aware of egress points in Contractor.
s
case of a bushfire emergency.
The civil contractor should consider what works are
undertaken on days of high or extreme fire danger to
ensure none of the works have the potential to start
a bushfire.
Bushfire to be considered in the CEMP or site
management plan.
dures for CEMP is to identify and follow recommendation Contractor.
a, should outlined in this REF.
auna or
es
be
a Soil The CEMP is to include all relevant recommendations Contractor.
prepared and works are to be carried out in accordance with
the recommendations.
The contractor is to engage a suitably qualified
consultant to ensure the final design of the works is
appropriate to the geotechnical conditions of the site