NOTE: ALL EARTHWORKS QUANTITIES ARE INDICATIVE ONLY,
BASED UPON BANKED VOLUMES WITH NO ALLOWANCE FOR
BULKING FACTORS. CONTRACTOR TO MAKE HIS OWN
ASSESSMENT OF EARTHWORKS QUANTITIES
/
/
/
/
780
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
RW
800
/
/
/
CUT / FILL QUANTITIES
/
/
/
/
/
/
/
820
/
/
/
/
/
/
/
/
-2329m³
TOTAL FILL (FROM PAVEMENT SUBGRADE
SURFACE TO NATURAL SURFACE)
3344m³
/
TOTAL CUT (FROM PAVEMENT SUBGRADE
SURFACE TO NATURAL SURFACE)
/
RW
/
/
RW
/
/
/
RW
/
840
/
/
/
/
/
/
TOTAL BALANCE
/
/
/
1015m³ (FILL)
/
/
/
/
/
/
/
860
/
/
/
/
/
/
/
/
/
/
/
/
/
870.98
879
880 .00
/
/
/
/
/
/
/
/
/
/
900
900.58
ASSUMPTIONS:
1. NO ALLOWANCE HAS BEEN MADE FOR STRIPPING.
2. NO ALLOWANCE HAS BEEN MADE FOR TRENCHING.
3. NO ALLOWANCE HAS BEEN MADE FOR TOPSOIL
REPLACEMENT.
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
920
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
940
/
/
/
/
/
/
/
/
/
/
/
/
/
960
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
980
/
/
1000
1020
1040
1060
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
1080
/
/
TC 10
/
/
/
/
/
/
/
1100
91.21
/
/
/
/
/
/
/
/
/
/
C
TCT 111
112 11 2.2
0 13. 3
99
114
11440.
CT 11 00
45.93
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
1160
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
1180
1184.8
3
/
/
/
/
/
/
/
AREA 3