LEGEND
FILL
CUT
-999 to 0
m
0
to 999
m
.79
NOTE: ALL EARTHWORKS QUANTITIES ARE INDICATIVE ONLY,
BASED UPON BANKED VOLUMES WITH NO ALLOWANCE FOR
BULKING FACTORS. CONTRACTOR TO MAKE HIS OWN
ASSESSMENT OF EARTHWORKS QUANTITIES
/
/
94
0
945
CUT / FILL QUANTITIES
/
/
92
/
/
0
/
/
/
-7571m³
TOTAL FILL (FROM PAVEMENT SUBGRADE
SURFACE TO NATURAL SURFACE)
30042m³
/
/
/
/
/
TOTAL CUT (FROM PAVEMENT SUBGRADE
SURFACE TO NATURAL SURFACE)
/
0
90
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
TOTAL BALANCE
/
/
/
/
/
/
22471m³ (FILL)
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
ASSUMPTIONS:
1. NO ALLOWANCE HAS BEEN MADE FOR STRIPPING.
2. NO ALLOWANCE HAS BEEN MADE FOR TRENCHING.
3. NO ALLOWANCE HAS BEEN MADE FOR TOPSOIL
REPLACEMENT.
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
90.08
/
/
/
7890.0
/
0
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
60
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
.59
/
40
TC 40
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
0.00
/
/
/
/
/
/
//
360
/
//
//
//
/
//
//
//
//
//
380
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
0
//
46
//
//
0
//
//
44
//
//
.36
//
400
//
//
4
CT20
42
3
20
/
340
295.00
300
/
280
/
260
/
320
TC 322.6
0
/
249.73
/
240
/
220
224.46
/
/
//
AREA 2