Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 617
LEGEND
FILL
CUT
-999 to 0
m
0
to 999
m
NOTE: ALL EARTHWORKS QUANTITIES ARE INDICATIVE ONLY,
BASED UPON BANKED VOLUMES WITH NO ALLOWANCE FOR
BULKING FACTORS. CONTRACTOR TO MAKE HIS OWN
ASSESSMENT OF EARTHWORKS QUANTITIES
CUT / FILL QUANTITIES
TOTAL CUT (FROM PAVEMENT SUBGRADE
SURFACE TO NATURAL SURFACE)
-1392m³
TOTAL FILL (FROM PAVEMENT SUBGRADE
SURFACE TO NATURAL SURFACE)
4127m³
TOTAL BALANCE
2735m³ (FILL)
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
540
420
440
/
/
/
/
/
/
/
/
/
/
/
/
/
400
460
/
/
/
/
/
/
/
/
/
/
/
/
/
380
480
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
340
TC 344.60
520
/
/
/
/
/
/
/
/
/
/
/
/
320
500
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
360
CT 360.02
ASSUMPTIONS:
1. NO ALLOWANCE HAS BEEN MADE FOR STRIPPING.
2. NO ALLOWANCE HAS BEEN MADE FOR TRENCHING.
3. NO ALLOWANCE HAS BEEN MADE FOR TOPSOIL
REPLACEMENT.
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
AREA 1