289324.228
289322.741
6230279.863
6230278.818
66.400
66.453
144°54'18.17"
324°54'18.17"
ARC
0.909
2.854
CT
TC
CT
TC
End
13.307
24.136
24.685
30.091
31.650
MODEL : CTRL MEDIAN - STRING : MA12 (CLOSED)
0.000
43.550
46.395
67.580
68.751
90.109
91.603
106.797
144.368
181.448
184.276
289321.026
289288.354
289286.086
289268.317
289267.418
289252.693
289253.360
289265.397
289294.420
289322.222
289321.026
6230249.377
6230220.582
6230218.869
6230207.333
6230206.587
6230191.116
6230190.376
6230199.647
6230223.497
6230248.032
6230249.377
66.060
65.476
65.436
65.257
65.260
65.492
65.521
65.406
65.621
66.072
66.060
228°21'32.03"
228°51'27.44"
237°00'29.18"
237°00'29.18"
223°35'14.07"
223°35'14.07"
52°23'34.80"
52°23'34.80"
48°47'02.90"
48°21'33.40"
228°21'33.40"
ARC
ARC
LINE
ARC
LINE
ARC
LINE
ARC
ARC
ARC
20.000
-5.000
-0.500
-596.499
-5004.999
-0.900
6229965.503
6229972.798
6229973.272
6229976.196
6229975.905
66.262
66.271
66.278
66.378
66.397
312°21'04.01"
312°21'04.01"
57°15'00.45"
57°15'00.45"
146°37'20.00"
LINE
ARC
LINE
ARC
0.300
1.000
10.829
0.549
5.406
1.560
MODEL : CTRL MEDIAN - STRING : MA25
PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN
Start
CC
CT
TC
CT
TC
CT
TC
CC
Point
End
289050.306
289042.303
289042.343
289046.889
289048.265
PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN
Start
CT
TC
CT
Point
End
2.845
21.185
1.171
21.359
1.494
15.194
37.571
37.080
2.828
0.000
2.648
5.470
7.145
12.408
15.547
289054.856
289056.116
289057.426
289056.491
289052.602
289054.947
6229965.414
6229963.086
6229960.587
6229959.865
6229963.410
6229965.496
66.369
66.356
66.342
66.334
66.307
66.373
150°49'00.06"
152°20'01.43"
152°20'01.43"
312°21'05.03"
48°21'00.77"
48°21'00.77"
ARC
LINE
ARC
LINE
LINE
0.600
MODEL : CTRL SHOULDERS - STRING : MK06
PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN
Start
CC
CC
CC
CC
End
0.000
2.405
5.715
17.817
21.131
23.594
2.822
1.676
5.262
3.139
289653.547
289651.983
289649.783
289638.438
289635.243
289632.868
6230095.371
6230097.109
6230099.446
6230103.653
6230103.314
6230103.027
73.571
73.639
73.729
73.851
73.813
73.785
294°39'18.31"
341°21'33.18"
292°05'51.66"
288°35'45.69"
239°16'31.79"
286°56'13.57"
ARC
ARC
ARC
ARC
ARC
-3.850
-198.018
-3.850
2.961
3.310
12.102
3.314
2.463
MODEL : CTRL SHOULDERS - STRING : MK07
PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN
Start
TC
CT
TC
CT
End
MODEL : CTRL DRIVEWAY - STRING : MD01
PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG
Start
End
0.000
18.067
289272.420
289285.475
6230359.141
6230371.631
65.162
64.017
46°16'04.30"
46°16'04.30"
0.000
1.272
2.821
5.854
7.398
8.688
289646.519
289646.101
289646.695
289649.537
289650.814
289651.297
6230114.828
6230113.626
6230112.361
6230111.299
6230111.861
6230113.057
73.678
73.753
73.787
73.744
73.687
73.587
199°11'52.92"
199°11'52.92"
110°29'07.59"
110°29'07.59"
21°59'14.61"
21°59'14.61"
LINE
ARC
LINE
ARC
LINE
-1.000
-1.000
1.548
3.033
1.545
1.290
LINE
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C117-00.dwg
131.952
134.806
MODEL : CTRL DRIVEWAY - STRING : MD02
PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.LEN
Start
Point
End
0.000
5.530
21.919
289269.772
289265.247
289256.191
6230354.212
6230351.033
6230337.374
65.349
65.202
63.672
234°54'33.85"
213°32'37.21"
213°32'37.21"
LINE
LINE
16.389
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
ALIGNMENT SETOUT TABLES
SHEET 2
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
N.T.S.
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C117-002
B
Mar 06, 2024 - 9:41am
Point