Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 571
UTILITIES LEGEND
ADJOINS SHEET 3
ADJOINS SHEET 1
EXISTING BOUNDARY
PROPOSED BOUNDARY
PROPOSED UTILITIES
PROPOSED STORMWATER
PROPOSED ELECTRICAL
PROPOSED LIGHTING COLUMNS
PROPOSED WATER MAIN
PROPOSED SEWER MAIN
PROPOSED COMMUNICATIONS
PROPOSED GAS
EXISTING UTILITIES TO REMAIN
Ø450 CICL WATER MAIN TO BE
PROTECTED AND RETAINED DURING
CULVERT EXTENSION WORKS
EXISTING DRAINAGE
ADJUST/REPLACE STOP VALVE TO
SUIT THE FINISHED SURFACE LEVEL
OVERHEAD ELECTRICAL
(ASSUMED BETWEEN POLES)
MOVE STOP VALVE AWAY
FROM CULVERT EXTENSION
LIGHTING COLUMN
500
480
460
440
MCB1
420
400
SEWER MAIN
(ELECTRONIC LOCATION)
380
360
CT 360.02
340
320
297.63
300
289.31
280
260
240
236.26
220 220.07
CT
183.84
CTP 183.87
WATER MAIN
(ELECTRONIC LOCATION)
COMMUNICATIONS
(ELECTRONIC LOCATION)
GAS
(ELECTRONIC LOCATION)
200
100
102.83
180
MCB1
TC 344.60
CAUTION - EXISTING SEWER
MAIN (500mm DICL) WITHIN THE
VICINITY OF WORKS
CAMDEN VALLEY WAY
E
DBYD
ELECTRICAL (DIGITISED)
W
DBYD
WATER MAIN (DIGITISED)