Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 548
62.05
61.94
61.90
61.88
62.66
62.86
62.79
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C112-03.dwg
0.72
912.48
SEWER LONGITUDINAL SECTION - 630 PE100 S-RM
A1 Horizontal Scale 1 : 500
A1 Vertical scale 1 : 100
SCALE 1:100 @ A1
SCALE 1:200 @ A3
0
1
2
4
6
8
10 metres
SCALE 1:500 @ A1
SCALE 1:1000 @ A3
0
5
10
20
30
40
50 metres
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
B
100% DETAIL DESIGN ISSUE FOR REVIEW
A
NOT ISSUED
Issue
-1
06.03.24
Description
0
1cm at full size
10cm
MDM
CAMDEN COUNCIL
TRC
-
-
-
Date
Drawn
Approved
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
SEWER LONGITUDINAL SECTIONS
SHEET 9
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
A1
AS SHOWN
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C112-039
B
Mar 06, 2024 - 9:38am
0.96
900
942.48
0.91
1.41
850
892.48
1.60
1.92
CHAINAGE
841.48
EXISTING SURFACE
PIPE COVER
808.95
3.00
DESIGN SURFACE
PIPE COVER
63.10
64.09
EXISTING SURFACE
63.25
65.17
DESIGN SURFACE
61.69
62.17
SEWER OBVERT LEVEL
61.65
DATUM R.L 58.1