6.12.6 Recommendation 3:
Minimise risks to water quality during construction, consistent with any specific requirements of the
approved SWMP, control measures implemented to minimise risks associated with erosion and
sedimentation entry to drainage lines and waterways. That is to include, but not necessarily be
limited to:
•
•
Sediment management devices, such as sediment fencing, straw bales or sandbags;
Measures to divert or capture and filter water prior to discharge, such as drainage
channels and first flush systems;
•
Installation of measures at work entry and exit points to minimise movement of material
onto adjoining roads, such as rumble grids or wheel wash bays; and
Appropriate location and storage of construction materials, fuels and chemicals, including
bunding where appropriate. The construction compound must maintain a minimum
clearance of 40m from the drainage line on Lot 1 DP 914674, as indicated on the plans
in Appendix I.
6.13 NOISE / VIBRATION
6.13.1 Existing Environment
The existing environment includes noise and vibration generated from vehicle egress and ingress
along Camden Valley Way.
6.13.2 Impact Assessment
The proposed activity can generate noise and vibration levels which can exceed construction
management levels during those times that operations are closest to businesses. Mitigation
Measures
Noise and Vibration Management Plan (NVMP) will be prepared for the activity.
6.13.3 Recommendation 1:
Pre-construction, the Project Manager is to ensure that a Noise and Vibration Management Plan
(NVMP) is prepared as part of the CEMP for construction noise. The NVMP will be prepared in
accordance with the ICNG and will identify:
•
All potential significant noise and vibration generating activities associated with the
activity;
•
Measures to be implemented during construction to minimise noise and vibration
impacts, such as restrictions on working hours, staging, placement and operation of
work compounds, parking and storage areas, temporary noise barriers, haul road
maintenance, and controlling the location and use of vibration generating equipment;
•
Feasible and reasonable mitigation measures to be implemented; and
•
Arrangements for consultation with potentially affected neighbours and sensitive
receivers, including notification and complaint handling procedures contingency
measures to be implemented in the event of non-compliance with noise and vibration
criteria.
•
Special consideration should be given to the amenity of the dwelling adjoining the
western boundary of Lot 1 DP 914674 where the construction compound is proposed.
Adequate noise mitigation measures should be implemented to minimise impact on this
receiver.