Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 499
UTILITIES LEGEND
ADJOINS SHEET 5
ADJOINS SHEET 5
EXISTING BOUNDARY
ADJOINS SHEET 4
ADJOINS SHEET 2
160
180
PROPOSED BOUNDARY
PROPOSED UTILITIES
PROPOSED STORMWATER
PROPOSED ELECTRICAL
MCA2
PROPOSED LIGHTING COLUMNS
PROPOSED WATER MAIN
PROPOSED SEWER MAIN
200
KIRKHAM LANE
PROPOSED COMMUNICATIONS
PROPOSED GAS
EXISTING OVERHEAD POWER, POWER
POLES, STAY POLES, AND LIGHTING
COLUMNS TO BE REMOVED
220
EXISTING UTILITIES TO REMAIN
EXISTING DRAINAGE
OVERHEAD ELECTRICAL
(ASSUMED BETWEEN POLES)
LIGHTING COLUMN
SEWER MAIN
(ELECTRONIC LOCATION)
800
780
760
MCB1
740
720
700
255.48
257.25
260
WATER MAIN
(ELECTRONIC LOCATION)
680
671.96
CT 674.84
667.41
660
640
620
621.54
623.99
MCB1
600
580
560
TC 563.58
540
520
500
240
COMMUNICATIONS
(ELECTRONIC LOCATION)
GAS
(ELECTRONIC LOCATION)
TC 269.56
278.06
0.00
TC 0.05
CAMDEN VALLEY WAY
CAMDEN VALLEY WAY
E
DBYD
ELECTRICAL (DIGITISED)
W
DBYD
WATER MAIN (DIGITISED)