Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 436
9-3
1
9-4
1
9-5
1
0.0051
0.2734
0.3094
0.4719
PA
10
10
EIA
60
5
0
5
RIA
0
0
0
PA
40
10
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
EIA
75
5
5
RIA
0
0
0
PA
25
10
0
EIA
75
5
5
RIA
0
0
0
PA
25
10
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
0.166
Surface Inlet Sag Pits
1200SQ SI Sag Pit
0.166
0.057
0.121
6.64
3.25
375
74.8
74.584
75.139
74.944
1.15
5.9
75.28
75.904
0.63
9-1
0.003
9-1
0
0
0
1.2m Opening HEC22
1.2m Opening 3% Fall 5% Grade
0.003
0.016
0.163
46.053
4.7
375
74.584
72.42
74.872
73.598
1.8
1.6
74.93
75.674
0.75
9-2
0.123
9-2
0.159
9.97
0.03
2.4m Opening HEC22
2.4m Opening 3% Fall 1% Grade
0.282
0.045
0.255
72.543
5.27
375
72.42
68.6
72.768
69.051
2.38
4.2
73.52
73.557
0.04
9-3
0.139
9-3
0.007
2.49
0.01
2.4m Opening HEC22
2.4m Opening 3% Fall 3% Grade
0.146
0.07
0.376
80.553
4.1
450
68.55
65.25
68.95
66.489
2.52
1.3
69.03
69.934
0.9
9-4
0.235
9-4
0.004
0.45
0.02
3.6m Opening HEC22
3.6m Opening 3% Fall 1% Grade
0.239
0.232
0.413
45.717
1.42
450
65.2
64.55
65.931
64.971
2.67
1.6
66.49
66.371
0
9-5
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C108-51.dwg
9-2
1
0.4008
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
STORMWATER MANAGEMENT CALCULATIONS 1% AEP
SHEET 2
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
N.T.S.
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C108-512
B
Mar 06, 2024 - 9:31am
9-1
1