Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 434
9-3
1
9-4
1
9-5
1
10-1
1
10-2
1
10-3
1
11-1
1
11-2
1
11-3
1
11-4
1
11-5
1
11-6
1
0.0051
0.2734
0.3094
0.4719
0.0959
0.1511
0.1262
0.0738
0.0305
0.0364
0.0767
0.0479
0.0715
16-2
1
12-1
1
0.0737
PA
10
10
EIA
60
5
0
5
RIA
0
0
0
PA
40
10
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
EIA
75
5
5
RIA
0
0
0
PA
25
10
0
EIA
75
5
5
RIA
0
0
0
PA
25
10
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
EIA
50
5
5
RIA
0
0
0
PA
50
10
0
EIA
90
5
5
0.166
1.8
1.6
74.93
75.674
0.75
9-2
0.123
9-2
0.159
9.97
0.03
2.4m Opening HEC22
2.4m Opening 3% Fall 1% Grade
0.282
0.045
0.255
72.543
5.27
375
72.42
68.6
72.768
69.051
2.38
4.2
73.52
73.557
0.04
9-3
0.139
9-3
0.007
2.49
0.01
2.4m Opening HEC22
2.4m Opening 3% Fall 3% Grade
0.146
0.07
0.376
80.553
4.1
450
68.55
65.25
68.95
66.489
2.52
1.3
69.03
69.934
0.9
9-4
0.235
9-4
0.004
0.45
0.02
3.6m Opening HEC22
3.6m Opening 3% Fall 1% Grade
0.239
0.232
0.413
45.717
1.42
450
65.2
64.55
65.931
64.971
2.67
1.6
66.49
66.371
0
9-5
IAD Pit 100% Capture
IAD Pit 100% Capture
0.037
0
0.042
9.601
6.4
375
65.464
64.85
66.157
66.154
0.38
5.9
66.18
66.681
0.5
10-1
3.0m Opening HEC22
3.0m Opening 3% Fall 3% Grade
0.077
0.159
0.153
18.923
0.53
375
64.8
64.7
65.825
65.749
1.39
5.9
66.14
65.98
0
10-2
3.0m Opening HEC22
3.0m Opening 3% Fall 3% Grade
0.064
0.007
0.247
20.624
0.48
375
64.65
64.55
65.303
64.897
2.31
1.8
65.68
65.827
0.15
10-3
1.8m Opening HEC22
1.8m Opening 3% Fall 3% Grade
0.037
0.004
0.036
21.323
2.34
375
72
71.5
72.175
71.675
0.72
5.9
72.17
73.373
1.2
11-1
0.037
0.075
9-5
0
0
0
0
5
5
10-2
0.001
0.11
0
0
0
0
EIA
90
5
5
RIA
0
0
0
0
PA
10
10
EIA
90
5
5
RIA
0
0
0
0
PA
10
10
EIA
90
5
5
RIA
0
0
0
0
PA
10
10
EIA
90
5
5
RIA
0
0
0
0
PA
10
10
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
EIA
0
RIA
0
PA
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
9-1
73.598
90
10
0.63
74.872
EIA
0
75.904
72.42
0.04
10
75.28
74.584
0
PA
5.9
375
0.14
RIA
1.15
4.7
0
5
74.944
46.053
0.002
5
75.139
0.163
10-1
90
74.584
0.016
12-1
EIA
74.8
0.003
0
0
375
1.2m Opening 3% Fall 5% Grade
0
0
3.25
1.2m Opening HEC22
0
0
6.64
0
10
10
0.121
0
0
0
0.057
0
10
10
0.166
9-1
PA
PA
1200SQ SI Sag Pit
0.003
RIA
RIA
Surface Inlet Sag Pits
0.063
11-7
0.037
0.015
11-1
0.084
2.02
0.14
1.8m Opening HEC22
1.8m Opening 3% Fall 3% Grade
0.099
0
0.053
26.261
2.28
375
71.5
70.9
71.675
71.089
1.04
1.5
71.67
72.988
1.31
11-2
0.018
11-2
0.001
0.22
0
1.8m Opening HEC22
1.8m Opening 3% Fall 3% Grade
0.019
0
0.767
53.781
3.03
750
70.5
68.87
71.032
69.457
2.29
1.9
71.07
72.301
1.23
11-3
0.038
11-3
0.01
0.55
0.04
2.4m Opening HEC22
2.4m Opening 3% Fall 1% Grade
0.048
0.002
0.866
35.138
3.35
750
68.853
67.676
69.415
68.193
2.67
1
69.44
70.416
0.97
11-4
0.024
11-4
0.005
0.77
0.01
1.8m Opening HEC22
1.8m Opening 3% Fall 5% Grade
0.029
0.001
0.885
41.725
3.6
750
67.676
66.175
68.18
67.345
2.8
0.5
68.18
69.178
1
11-5
0.036
11-5
0
0
0
2.4m Opening HEC22
2.4m Opening 3% Fall 3% Grade
0.036
0.001
0.227
2.87
1.05
375
66.155
66.125
66.847
66.803
2.06
2.3
67.31
67.646
0.34
11-6
IAD Pit 100% Capture
IAD Pit 100% Capture
0
0.227
4.046
1.11
375
66.125
66.08
66.5
66.418
2.16
1.5
66.78
67.843
1.06
16-2
1.8m Opening HEC22
1.8m Opening 3% Fall 3% Grade
0.037
0.073
19.1
1.02
375
66.37
66.175
67.377
67.345
0.66
4.2
67.41
68.035
0.63
12-1
0.037
13-1
0
0
0
0.04
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C108-51.dwg
9-2
1
0.4008
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
STORMWATER MANAGEMENT CALCULATIONS 1% AEP
SHEET 1
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
N.T.S.
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C108-511
B
Mar 06, 2024 - 9:31am
9-1
1