Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 432
9-3
10
9-4
10
9-5
10
0.0051
0.2734
0.3094
0.4719
PA
10
10
0
EIA
60
5
5
RIA
0
0
0
PA
40
10
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
EIA
75
5
5
RIA
0
0
0
PA
25
10
0
EIA
75
5
5
RIA
0
0
0
PA
25
10
0
EIA
90
5
5
RIA
0
0
0
PA
10
10
0
0.099
Surface Inlet Sag Pits
1200SQ SI Sag Pit
0.099
0.022
0.077
6.64
3.25
375
74.8
74.584
75.002
74.84
1.27
5.9
75.08
75.904
0.82
9-1
0.002
9-1
0
0
0
1.2m Opening HEC22
1.2m Opening 3% Fall 5% Grade
0.002
0
0.098
46.053
4.7
375
74.584
72.42
74.813
72.755
1.39
1.6
74.84
75.674
0.83
9-2
0.079
9-2
0
0
0
2.4m Opening HEC22
2.4m Opening 3% Fall 1% Grade
0.079
0.008
0.169
72.543
5.27
375
72.42
68.6
72.722
68.916
1.78
4
72.75
73.557
0.8
9-3
0.09
9-3
0
0
0
2.4m Opening HEC22
2.4m Opening 3% Fall 3% Grade
0.09
0.018
0.233
80.553
4.1
450
68.55
65.25
68.888
66.203
1.82
1.1
68.92
69.934
1.02
9-4
0.156
9-4
0
0
0
3.6m Opening HEC22
3.6m Opening 3% Fall 1% Grade
0.156
0.022
0.367
45.717
1.42
450
65.2
64.55
65.746
64.959
2.42
1.6
66.2
66.371
0.17
9-5
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C108-50.dwg
9-2
10
0.4008
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
STORMWATER MANAGEMENT CALCULATIONS 10% AEP
SHEET 2
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
N.T.S.
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C108-502
B
Mar 06, 2024 - 9:31am
9-1
10