Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 410
2100 MAX
150
N12-200 E.W. CENTRAL
IN BASE (TYP).
SECTION
N.T.S
1
SCALE 1:20
CJ
N12-200 EACH WAY CENTRAL
WHERE PIT < 2000D
N12 -150 E.W. CENTRAL FOR
2000-2500D.
MASS CONCRETE BENCHING.
SEE NOTE 15 FOR DETAILS
ON C609-301
CJ
CJ
150
2100 MAX
SECTION
-
T
450 LAP
TYP.
650
SEE NOTE 16 FOR
DETAILS ON C609-301
N12-200 STARTER BARS LAP 500
WITH WALL REINFORCEMENT
AND COG 200 INTO BASE SLAB
TYPICAL PIT CORNER DETAIL
200
330
3N16 EXTRA
PLAN
N.T.S
150
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C108-30.dwg
150
N12-200 TOP AND BOTTOM EACH WAY
2
-
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
STORMWATER DETAILS
SHEET 2
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
N.T.S.
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C108-308
B
Mar 06, 2024 - 9:30am
2500 MAX
CJ
200
CJ
T
200
200
CONCRETE GROUT MAKE UP
AS REQUIRED TYP. MAXIMUM
MAKE UP IS 100MM
900
CJ
LIP LEVEL
1800
GUTTER TRANSITION AS REQUIRED
℄ PIT
MASS CONCRETE BENCHING.
SEE NOTE 15 FOR DETAILS
ON C609-301
DEPTH TO SUIT LINTEL
500
MIN
℄ OPENING AND LINTEL
100
MIN
1800
GUTTER TRANSITION AS REQUIRED
COUNCIL APPROVED
PRECAST CONCRETE LINTEL
TOP OF
KERB LINE
FOR ROLL KERB & GUTTER
LINTEL TO BE RAISED 30mm.
TRANSITION OVER 1800mm
SAG LINTEL SHOWN. PIT TO BE
POSITIONED TO SUIT REQUIRED
LINTEL CONFIGURATION.