CONCRETE NOTES
CONCRETE PAVEMENT NOTES
1.
CP1.
PROVIDE JOINTS AS DETAILED ON SHEET C11.01.
CP2.
JOINTS REQUIRE ON GOING MAINTENANCE TO ENSURE
LONG TERM PERFORMANCE OF THE SLAB.
JOINTS AND SEALANTS SHOULD BE INSPECTED AND
REPAIRED AS NECESSARY AS PART OF THE ONGOING
MAINTENANCE PROGRAM.
DOWELS ARE TO BE STRAIGHT, TO THE LENGTH
SPECIFIED AND FREE FROM MILL SCALE, RUST AND OIL
CP5.
ALL SAWCUT JOINTS ARE TO BE FORMED USING AN
EARLY-ENTRY SAWCUT SYSTEM SUCH AS 'SOFFCUT'.
SAWCUTS TO BE FORMED AS SOON AS THE CONCRETE
HAS HARDENED SUFFICIENTLY THAT IT WILL NOT BE
DAMAGED BY SAWING. THE REQUIRED TIMING OF THE
SAWCUT IS SUBJECT TO ON-SITE CONDITIONS AND AS
SUCH IS THE RESPONSIBILITY OF THE CONTRACTOR,
HOWEVER AS A GUIDE, EARLY-ENTRY SAWING CAN
USUALLY BE UNDERTAKEN UPON COMPLETION OF
POWER FLOATING.
CURING OF ALL CONCRETE IS TO BE ACHIEVED BY KEEPING
SERVICES CONTINUOUSLY WET FOR A PERIOD OF 3 DAYS,
AND PREVENTION OF LOSS OF MOISTURE FOR A TOTAL OF
7 DAYS FOLLOWED BY A GRADUAL DRYING OUT. APPROVED
SPRAYED ON CURING COMPOUNDS THAT COMPLY WITH
AS3799 MAY BE USED WHERE FINISHES WILL NOT BE
AFFECTED (REFER MANUFACTURER'S SPECIFICATION).
POLYTHENE SHEETING OR WET HESSIAN MAY BE USED TO
RETAIN CONCRETE MOISTURE WHERE NOT PROTECTED
CP6.
ANY DEFECTS IN THE CONCRETE PAVEMENT ARE TO BE
REFERRED TO THE SUPERINTENDENT FOR REVIEW.
CP7.
THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT
THE CONCRETE PAVEMENT FROM CONSTRUCTION
TRAFFIC AND OTHER CONSTRUCTION LOADS.
CP8.
WHERE STEEL FIBRE REINFORCEMENT HAS BEEN
SPECIFIED IT IS TO BE OF THE SIZE, TYPE AND DOSAGE
RATE SPECIFIED. NO SUBSTITUTION IS TO BE MADE
WITHOUT APPROVAL OF THE ENGINEER.
ALL STEEL FIBRE REINFORCED CONCRETE SHALL BE
MANUFACTURED, SUPPLIED AND INSTALLED IN
PROVIDE ISOLATION JOINT
1500
200mm THICK CONCRETE
ANULUS WITH SL82 MESH
AT 50mm TOP COVER
2%
150
DEEP LIFT
ASPHALT
300
300
MIN.
PAVEMENT
SURFACE
SCALE 1:50
300 WIDE BARRIER
KERB
150
SMZ
CENTRE ISLAND TO BE
LANDSCAPED BY OTHERS
230
CP4.
SUB SOIL
DRAINAGE
300
25
9.
THE FINISHED CONCRETE SHALL BE A DENSE
HOMOGENOUS MASS, COMPLETELY FILLING THE
FORMWORK THOROUGHLY EMBEDDING THE
REINFORCEMENT AND FREE OF STONE POCKETS. ALL
CONCRETE INCLUDING SLABS ON GROUND AND FOOTINGS
SHALL BE COMPACTED WITH MECHANICAL VIBRATORS.
2%
ROUNDABOUT TYPICAL CROSS SECTION
200
8.
℄
REFER DETAIL
BELOW
B) ROUND DOWELS TO BE GRADE 250 BAR IN
ACCORDANCE WITH AS 3679.1-2010
CONCRETE SIZES SHOWN DO NOT INCLUDE THICKNESSES
OF APPLIED FINISHES.
REFER LANDSCAPE PLANS FOR DETAILS
PROVIDE MIN. 500
DEEP TOPSOIL/
GARDEN MIX
150
MIN.
7.
ALL REINFORCEMENT SHALL BE FIRMLY SUPPORTED ON
MILD STEEL PLASTIC TIPPED CHAIRS, PLASTIC CHAIRS OR
CONCRETE CHAIRS AT NOT GREATER THAN 1 METRE
CENTRES BOTH WAYS. BARS SHALL BE TIED AT ALTERNATE
INTERSECTIONS. IN EXPOSURE CONDITIONS GREATER
THAN B1 USE ONLY PLASTIC CHAIRS.
2%
1500mm
170
6.
A) SQUARE DOWELS TO BE GRADE 300 BAR IN
ACCORDANCE WITH AS 3679.1-2010
PROJECT CONTROL TESTING SHALL BE CARRIED OUT IN
ACCORDANCE WITH AS10120.
NO ADMIXTURES SHALL BE USED IN CONCRETE UNLESS
APPROVED IN WRITING.
DOWEL GRADE
PROVIDE MIN. 0.5m DEEP
TOPSOIL/GARDEN MIX
BARRIER KERB
300 WIDE
100
5.
CP3.
30
4.
READYMIX CONCRETE SUPPLY SHALL COMPLY WITH
AS1379.
Ø25000mm
1500mm
240
3.
CONCRETE TO COMPLY WITH THE FOLLOWING:
28 DAY COMPRESSIVE STRENGH - F'c = 32MPa
MAX 28 DAY SHRINKAGE - 600 MICROSTRAIN
Ø28000mm
300
2.
ALL WORKMANSHIP AND MATERIALS SHALL COMPLY WITH
AS 3600, CURRENT EDITIONS WITH AMENDMENTS EXCEPT
WHERE VARIED BY THE CONTRACT DOCUMENTS.
PROVIDE 'BIDIM A64'
FILTER FABRIC OR
APPROVED EQUIVALENT
ROUNDABOUT ANNULUS DETAIL NOTES:
1.
ALL DIMENSIONS IN MILLIMETRES. U.N.O
2. CONCRETE TO HAVE 32MPa COMPRESSIVE
STRENGTH (F'c) AT 28 DAYS AND SLUMP OF 60mm.
3. MESH TO HAVE A MIN 300mm LAP LENGTH AND
MIN 50 COVER UNLESS SHOWN OTHERWISE.
4. ALL MOUNTABLE KERB FACES TO BE PAINTED
REFLECTIVE WHITE.