Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 262
CH 520
Ex Sewr
500mm DICL
CL.63.35
1 in 4
2.0%
1 in -4
375mm DICL
CL.64.4
Ex Sewr
630mm PE
CL.63.41
Ex Sewr
500mm DICL
CL.63.35
2
4
6
8
1 in 4
Ex Coms
375mm DICL
CL.64.36
0.54
0.45
0.60
0.58
0.48
0.50
0.50
0.49
64.75
64.80
64.80
64.82
64.96
64.99
65.00
65.03
9.86
10.31
10.34
10.49
12.31
14.81
15.41
16.41
19.03
19.53
20.82
65.29
65.25
65.40
65.40
65.44
65.49
65.50
65.52
64.86
64.86
65.19
0.60
64.78
6.81
65.38
0.59
65.49
64.89
3.31
64.85
0.00
0.54
64.71
64.71
64.71
64.71
64.75
-7.18
-7.03
-7.00
-6.55
-3.50
0.92
65.37
64.44
-10.50
19.04
19.54
20.60
DESIGN
OFFSETS
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C106-30.dwg
1
1 in -4
CH 540
10 metres
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
ROAD CROSS SECTIONS
CAMDEN VALLEY WAY - MCB1
SHEET 7
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
1:100
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C106-307
B
Mar 06, 2024 - 9:20am
0
64.36
64.98
64.98
65.25
EXISTING
LEVELS
CH 500
SCALE 1:100 @ A1
SCALE 1:200 @ A3
Ex Watr
250mm CICL
CL.63.72
-14.52
0.90
0.88
1.03
1.03
1.06
0.83
0.81
0.80
65.62
65.58
65.73
65.73
65.77
65.82
65.86
65.88
DESIGN
LEVELS
64.72
64.70
64.70
64.70
64.71
64.98
65.05
65.08
7.54
7.99
8.02
8.17
9.99
12.49
14.47
15.47
65.79
65.82
65.71
64.82
4.49
-7.18
-7.03
-7.00
-6.55
-3.50
64.83
64.86
65.70
65.70
65.55
65.59
65.68
64.71
64.71
64.71
64.71
64.74
64.45
-10.50
0.00
0.99
1.32
65.77
64.42
-15.90
0.89
LEVEL
DIFFERENCE
0.96
0.96
LEVEL
DIFFERENCE
0.99
0.99
0.84
0.88
0.94
DATUM R.L 57.00
DESIGN
OFFSETS
2.0%
450mm CICL
CL.61.75
DATUM R.L 57.00
EXISTING
LEVELS
-3.0%
Ex Watr
Ex Coms
450mm CICL
CL.61.79
DESIGN
LEVELS
3.0%
-3.0%
65.39
Ex Sewr
630mm PE
CL.63.09
Ex Watr
250mm CICL
CL.63.91
1 in -4
0.59
0.59
0.44
0.48
0.53
Ex Watr
2.0%
-3.0%
-3.0%
65.30
65.30
65.15
65.19
65.28
2.0%
1 in -4
MCB1
MCB1
CH 560