Review of Environmental Factors - Camden Valley Way Upgrade and Liz Kernohan Drive Extension (Final) - Flipbook - Page 244
PROPOSED 4 x 2100W x 1500H
RCBC
HERBERT RIVULET WORKS
- NOT IN THIS CONTRACT
HERBERT RIVULET WORKS
- NOT IN THIS CONTRACT
TYPICAL SECTION - (MCA1) - LIZ KERNOHAN DRIVE
(APPROX. CH560)
0
0.5
1
2
3
4
5 metres
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
TYPICAL ROAD CROSS SECTIONS
SHEET 5
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
1:50
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C106-205
B
Mar 06, 2024 - 9:20am
SCALE 1:50 @ A1
SCALE 1:100 @ A3
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C106-20.dwg
SCALE 1:50