30.
15.
THE ESCP/SWMP AND IT ASSOCIATED EROSION AND SEDIMENT CONTROL MEASURES
MUST BE CONSTANTLY MONITORED, REVIEWED AND MODIFIED AS REQUIRED TO
CORRECT DEFICIENCIES. COUNCILS HAS THE RIGHT TO REQUEST CHANGES IF, IN ITS
OPINION, THE MEASURES THAT ARE PROPOSED OR HAVE BEEN INSTALLED ARE
INADEQUATE TO PREVENT POLLUTION.
ANY BASIN MUST BE DE-WATERED AS SOON AS PRACTICAL. ONCE WATER
CAPTURED IN THE BASIN ACHIEVES COUNCIL'S WATER QUALITY OBJECTIVES,
SPECIFIED IN THESE CONDITIONS.
31.
SUFFICIENT QUANTITIES OF CHEMICALS/ AGENTS TO TREAT TURBID WATER
(FLOCCULATING/ COAGULANTS) MUST BE SECURELY STORED ON-SITE TO PROVIDE
FOR AT LEAST THREE COMPLETE TREATMENTS OF ALL BASINS REQUIRING
CHEMICALLY TREATMENT ONSITE.
32.
THE APPLICANT MUST ENSURE THAT ON EACH OCCASION A TYPE F OR TYPE D
BASIN WAS NOT DE-WATERED PRIOR TO BEING SURCHARGED BY A FOLLOWING
RAINFALL EVENT. A REPORT IS PRESENTED TO AN APPROPRIATE COUNCIL OFFICER
WITHIN 5 DAYS IDENTIFYING THE CIRCUMSTANCES AND PROPOSED AMENDMENTS,
IF ANY, TO THE BASIN'S OPERATING PROCEDURES.
16.
ALL ESC MEASURES MUST BE APPROPRIATE FOR THE SEDIMENT TYPE(S) OF THE
SOILS ONSITE. IN ACCORDANCE WITH THE BLUE BOOK (MANAGING URBAN
STORMWATER - SOILS AND CONSTRUCTION LANDCOM, 2004), OR OTHER CURRENT
RECOGNISED INDUSTRY STANDARD FOR EROSION AND SEDIMENT CONTROL FOR
AUSTRALIAN CONDITIONS.
17.
ALL REASONABLE AND PRACTICABLE MEASURES MUST BE TAKEN TO ENSURE
STORMWATER RUNOFF FROM ACCESS ROADS AND STABILISED ENTRY/ EXIT
SYSTEMS, DRAINS TO AN APPROPRIATE SEDIMENT CONTROL DEVICE.
33.
18.
SEDIMENT DEPOSITED OFF SITE AS A RESULT OF ONSITE ACTIVITIES MUST BE
COLLECTED AND THE AREA CLEANED/ REHABILITATED AS SOON AS REASONABLE AND
PRACTICABLE.
ALL SEDIMENT BASINS MUST REMAIN FULLY OPERATIONAL AT ALL TIMES UNTIL THE
BASINS DESIGN CATCHMENTS ACHIEVES 70% GROUND COVERAGE, OR SURFACE
STABILISATION ACCEPTABLE TO COUNCIL.
34.
19.
NEWLY SEALED HARD-STAND AREA (E.G. ROADS, DRIVEWAYS AND CAR PARKS) MUST
BE SWEPT THOROUGHLY AS SOON AS PRACTICABLE AFTER SEALING/ SURFACING TO
MINIMISE THE RISK OF COMPONENTS OF THE SURFACING COMPOUND ENTERING
STORMWATER DRAINS.
SETTLED SEDIMENT MUST BE REMOVED AS SOON AS REASONABLE AND
PRACTICABLE FROM ANY SEDIMENT BASIN
IT IS ANTICIPATED THAT THE NEXT STORM EVENT IS LIKELY TO CAUSE SEDIMENT
TO SETTLE ABOVE THE BASIN'S SEDIMENT STORAGE ZONE; OR
THE ELEVATION OF SETTLED SEDIMENT IS ABOVE THE TOP OF THE BASIN'S
SEDIMENT STORAGE ZONE; OR
THE ELEVATION OF SETTLED SEDIMENT IS ABOVE THE BASINS SEDIMENT
MARKER LINE.
35.
SCOUR PROTECTION MEASURES PLACES ON SEDIMENT BASIN EMERGENCY
SPILLWAYS MUST APPROPRIATELY PROJECT THE SPILLWAY CHUTE AND ITS SIDE
BATTERS FROM SCOUR, AND MUST EXTEND A MINIMUM OF 3m BEYOND THE
DOWNSTREAM TOE OF THE BASIN'S EMBANKMENT.
20. STOCKPILES OF ERODIBLE MATERIAL MUST BE PROVEN WITH AN APPROPRIATE
PROTECTIVE COVER (SYNTHETIC OR ORGANIC) IF THE MATERIALS ARE LIKELY TO BE
STOCKPILED FOR MORE THAN 10 DAYS.
21. STOCKPILES, TEMPORARY OR PERMANENT, SHALL NOT BE LOCATED IN AREAS
IDENTIFIED AS NO-GO ZONES ON THE ESCP/SWMP.
36.
\NEWPROJ1ProjectsNSW21NSW210622DrawingsCADCIVDrawings20 CVW and LKD Consolidated PlansNSW210622-C103-10.dwg
AN AREA OF NO MORE THAN 2Ha IS TO BE DISTURBED AT ANY TIME
ALL ESC MEASURES MUST BE INSPECTED:
AT LEAST DAILY (WHEN WORK IS OCCURRING ON-SITE); AND
AT LEAST WEEKLY (WHEN WORK IS NOT OCCURRING ON-SITE); AND
WITHIN 24HRS OF EXPECTED RAINFALL; AND
WITHIN 18HRS OF A RAINFALL EVENT THAT CAUSES RUNOFF ON THE SITE)
NOT FOR CONSTRUCTION
Client
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
North
TRC
B
100% DETAIL DESIGN ISSUE FOR REVIEW
06.03.24
A
DRAFT ISSUE FOR REVIEW
01.08.23
MDM
TRC
Date
Drawn
Approved
Issue
-1
MDM
Description
0
1cm at full size
10cm
CAMDEN COUNCIL
20cm
70 CENTRAL AVENUE
ORAN PARK, NSW 2570
PHONE : (02) 4654 7777
FAX : (02) 4954 7829
© COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
ACOR Consultants Pty Ltd
Project
CAMDEN VALLEY WAY UPGRADE
BETWEEN HILDER STREET AND
T +61 2 4926 4811 KIRKHAM LANE INCLUDING
LIZ KERNOHAN DRIVE EXTENSION
The Forum, Level 1
Suite 1 240-244 Pacific Highway
Charlestown NSW 2290
Drawing Title
SOIL EROSION AND SEDIMENT CONTROL NOTES
SHEET 1
Drawn
Date
JER
MAR 2023
Designed
Project No.
SP
Scale
N.T.S.
A1
NSW210622
Q.A. Check
Date
TRC
28.02.24
Dwg. No.
Issue
C103-101
B
Mar 06, 2024 - 9:12am