Narellan Creek Overland Flood Study (Vol 1) - Flipbook - Page 64
Narellan Creek Catchment
Flood Study
•
The suitability of the flood fringe was tested by blocking out all flood fringe areas
and re-running the design flood and confirming if this produced an unacceptable
flood impact (as noted in Table 15, removing flood fringe areas should not have a
significant impact on flood behaviour). For this study an