Narellan Creek Overland Flood Study (Vol 1) - Flipbook - Page 29
Narellan Creek Catchment
Flood Study
Plate 5
Local Environmental Plan 2010 zones
2.6
Engineering Plans
Camden Council provided design and work-as-executed plans for several locations within
the catchment. The plans provided details of stormwater infrastructure, hydraulic
structures, and creek cross-sections for localised areas within the catchment. The plans that
were utilised included:
Harrington Grove West – Spine Road (Stage 3)
Narellan Creek Cross-sections, Harrington Park
Harrington Grove Precinct M Spine Road Stage 3 WAE Plans
Narellan Sports Hub Civil Drawings
Northern Road Upgrade Stage 1 - TNR1 WAE Stormwater Management
Narellan Road Upgrade Stage B - Drainage SWC WAE.pdf
316 Camden Valley Way - Trunk Drainage Plan
Intersection Old Northern Road & Camden Valley Way - 326 Camden Valley Way
Narellan - WAE Plans
Lot 100 & Lot 101 DP851222, Hartley Road, Smeaton Grange - WAE Engineering Plans
Harrington Park Stage 6 – Roadworks, Drainage and Sewerage and Water Reticulation
15