LOCATION
Material
Finish
Brickwork
Glazed
Face
Colour
Dimension
NOTE
r
Ceiling
None Required
r
r
r
r
Cornice
None Required
r
r
r
r
OPENINGS
TYPE
Door
Description
Finish
Hinged Solid
Paint
r
Pressed
Galvanised
r
and Paint
To Suit Door
Metal Frame
r
r
Core Timber
Door Frame
Window
None
r
Colour
Dimension
NOTE
Leaf
r
Required
Opening
Hardware
Confirm with Camden Council prior to commencement of works.
FITOUT
TYPE
Fixtures
Description
Number
NOTE
As Required to Service
As Required
r
As Required
r
As Required
r
r
r
Fixtures and Similar
Connecting to the Service
Duct
Fittings
As Required to Service
Fixtures and Similar
Connecting to the Service
Duct
Equipment
As Required to Service
Fixtures and Similar
Connecting to the Service
Duct
Fixed Furniture
PAGE 242
None
APPENDIX B-SPORTS FACILIT Y BUILDING